Our latest completed projects... Prestige Construction Nottingham Ltd


Hi welcome to prestige construction,please find brief description of our latest completed projects this year.

New complete project managed label m hair salon.The work was completed in approx 8 weeks and was turned from an empty shell into a latest top of the range cutting edge salon including glass block walls,95 sq metres of porcelain flooring,new suspended ceilings incorparating in line air conditioning,new beauty/treatment room with latest insulation and soundproofing.The latest amtico polyflooring system,new kitchen and office,the latest burgalar/alarm system,mood lighting and cutting edge reception area.completed /05/05/10

Two storey detatched house extension incorporating a new down stair layout including a new kithen ,new wall and floor tiling ,solid oak flooring and a new wetroom/ensuite off the masterbedroom.this project took approx 12 weeks from start to finsh.completed 23/03/10

A bathroom conversion from seperate toilet and bathroom to mergeing into one large wetroom including the latest rainforest shower system with walkin full glass screen wallhung toilet sytem and wall hung sink system the latest porcelain tiles.This project took approx 3 weeks to complete from start to finish.completed 28/04/10

 

Full internal house renovation including full replaster to entire house ,new kitchen incorparating integral appliances,wall tiling,new laminated flooring throughout and new skirting and architreve also new windows and doors throughout the property.This project took approx 4 weeks to completecompleted 14/02/10

another two storey extension with new ensuite shoer room new porch and patio.complete project managed build over 12 weeks .completed 16/8/10

single storey rear vaulted ceiling extension including 2 x rooflights,a new open planned interior including the latest modern style kitchen with granite worktops,new downstairs w/c and polyflooring throughout.completed 16/09/10

another local two storey extension in block and rendered finish incorparating a new double gabled roof with valley and 4 new bedrooms a new bathroom and ensuite shower room.completed 22/11/10

These including the project we are currently undertaking will be the last of 2010,lets hope 2011 is as productive for all my team.